UAE’s First 3D Printed Federal Guard Room – Ministry of Energy & Infrastructure

Project type

Large-Scale Buildings

Date

November 2021

Location

Al Madam Court Complex – Sharjah, UAE

Project Importance

Federal First: The project marks the first 3D printed government facility in the UAE, commissioned by the Ministry of Energy & Infrastructure (MOEI).

Sustainability in Action: The construction method reduced material waste by over 60% and cut costs by up to 20%, aligning with UAE sustainability goals and MoEI’s strategy to integrate Fourth Industrial Revolution technologies.

Federal Infrastructure Innovation: This project is a working proof of concept for scalable 3D printed infrastructure in the public sector, setting a new precedent for how small-scale functional buildings can be built smarter.

Role of 3DVinci Creations

Design Optimization for 3D Printing: 3DVinci supported the design adaptation process, ensuring that the guard room met functional needs while being structurally compatible with additive construction.

End-to-End 3D Concrete Printing: 3DVinci fabricated the entire concrete structure on-site, layer by layer, using a custom concrete mix developed to withstand the harsh UAE climate.

Sustainable Local Execution: The mix used was created with locally sourced materials, providing thermal insulation and structural integrity with minimal environmental impact.

Collaborative Delivery: The project was executed in close coordination with MoEI engineers and local contractors, successfully demonstrating the potential of rapid, smart, and green construction.